2020-07-19 Notes
TGC
- URAM are 4096x72 (288k). in VU90 there are 960.
- BRAM are
- Trigger path
- TGC-BW wire reconstruction
- 92 "units" per SL
- 4x URAM per Unit = 368 URAM
- TGC-BW strip segment reconstruction
- 88 "units" per SL
- 1x URAM per 2 units = 44 URAM
- Strips+wires combined using BRAMS (not yet developed)
- TGC+NSW combined using BRAMs (not yet developed)
- TGC-EI/RPC/Tilecal combined using BRAMS
- TGC-BW wire reconstruction
- DAQ path
- 4 BX per L0A
- 6700 ch bitmap convert to hits (40 hits/BX for PU=200)
- convert in parallel
- prototype for 32 channels implemented
- Missing
- All interfaces
- TTC
- Control/monitoring