Version 7 (modified by 5 years ago) (diff) | ,
---|
Bring up procedure
- Carefully review and check the ECOs.
- Measure the resistance between power supplies
Supply | Base-resistance | loc |
3.3V STB J27 12V J28 4.5V Z J25 3.0V Z J26 3.3V Z J29 1.8V Z J30 4.5V J32 3.0V J33 3.3V J34 1.8V J35
Attachments (3)
- BringUpTestingPowerSupply.jpg (500.0 KB) - added by 5 years ago.
-
ProperZynqOrientation.jpg (1008.5 KB) - added by 5 years ago.
Proper orientation of the Zynq in the Service Module
- KaptonTapeOverTraces+Holes.JPG (2.2 MB) - added by 5 years ago.