Version 4 (modified by 5 years ago) (diff) | ,
---|
Bring up procedure
- Carefully review and check the ECOs.
- Measure the resistance between power supplies
Supply | Base-resistance | loc |
3.3V STB | ||
12V | ||
3.3V Z | ||
1.8V Z | ||
3.3V | ||
1.8V |
Attachments (3)
- BringUpTestingPowerSupply.jpg (500.0 KB) - added by 5 years ago.
-
ProperZynqOrientation.jpg (1008.5 KB) - added by 5 years ago.
Proper orientation of the Zynq in the Service Module
- KaptonTapeOverTraces+Holes.JPG (2.2 MB) - added by 5 years ago.