Version 3 (modified by 5 years ago) (diff) | ,
---|
Bring up procedure
- Carefully review and check the ECOs.
- Measure the resistance between power supplies
Supply|Base-resistance|loc |
|3.3V STB | | | | 12V | | | | 3.3V Z | | | | 1.8V Z | | | | 3.3V | | | | 1.8V | | |
Attachments (3)
- BringUpTestingPowerSupply.jpg (500.0 KB) - added by 5 years ago.
-
ProperZynqOrientation.jpg (1008.5 KB) - added by 5 years ago.
Proper orientation of the Zynq in the Service Module
- KaptonTapeOverTraces+Holes.JPG (2.2 MB) - added by 5 years ago.